HomeNews

| HISTORY OF JIG INSPECTIONS

HISTORIQUE+DES+INSPECTIONS+JIG

The question of JIG inspections at GESTOCI began in 2013 with the development of the BCP (business continuity plan) in HRS aviation depots, belonging to multinationals (CORLAY, OLA ENERGY, TOTAL, VIVO ENERGY). It is clear from this plan that the GESTOCI Abidjan depot is the alternative to the SPCI depots to supply the airport, if necessary.
From 2014 to 2016, there were annual visits to the GESTOCI depot by JIG inspectors. During these visits, the inspectors raised awareness of good practices relating to Jet A1 operations, given the sensitivity of the product. It is from 2017 that GESTOCI has been subject to JIG inspection.

JIG INSPECTION RATINGS

The scores likely to be obtained at the end of an inspection are as follows:

"Good"

Used when the following criteria are met:

  • No open recommendations from the previous JIG inspection report that are not under the control of the depot;
  • No new critical recommendations;
  • The new recommendations are of a minor type and do not affect the entire organization;
    Evidence of good HSE performance.

"Satisfactory"

There are no deviations on Quality control and HSE issues. The previous recommendations have been effectively closed with clear action plans, in order to avoid their reopening.

"Less Than Satisfactory"

Operations show signs of failure to meet Quality and HSE standards. Recommendations from previous inspections have not been closed effectively or the attitude of the management shows that the quality of the services will deteriorate rather than improve.

See also...

IMG
EXCELLENCE PRIZE - 2nd edition of the GESTOCI Excellence Prize: the four best award-winning agents
  Sam. 25 Juil.
  35348

They are four, including a woman, to have been honored at the 2nd edition of the GESTOCI Excellence Award, on Saturday November 02, 2019 in Abidjan. D ...

Read more
IMG
PREVENTION AND MANAGEMENT OF CLAIMS / GUARANTEED SAFETY ON THE GESTOCI ABIDJAN AND YAMOUSSOUKRO FACILITIES
  Ven. 24 Juil.
  23220

The GESTOCI depots in Abidjan-Vridi and Yamoussoukro are high-risk areas. Because they are not immune to a fire which represents the first disaster on ...

Read more
IMG
SUPPLY OF THE AIRPORT DEPOT BY JET A1 The Joint Inspection Group (JIG) awards the rating <<Satisfactory>>
  Ven. 24 Juil.
  34407

In October 2019, GESTOCI obtained a “Satisfactory” rating following the inspection carried out by “Joint Inspection Group (JIG)&rdqu ...

Read more
IMG
ABIDJAN-VRIDI OIL TERMINAL (TPAV)
  Ven. 24 Juil.
  35936

1- Geographical locationCommissioned in 1983, the Abidjan - Vridi Petroleum Terminal (TPAV) is the main depot of the Société de Gestion ...

Read more
IMG
Capacity building : the 13 members of the GESTOCI Strategic Watch Committee in three-day training
  Lun. 06 Juil.
  21729

The Director General of GESTOCI, Ibrahima Doumbia, presided on July 1, 2020 at the Tiama Hotel in Abidjan-Plateau, the opening ceremony of a three-day ...

Read more
IMG
International Women's Rights Day: GESTOCI women educated on their role as peacemakers
  Sam. 20 Jui.
  27900

On the initiative of the Managing Director of the Société de Gestion des Stocks Pétroliers de Côte d'Ivoire (GESTOCI), Ibra ...

Read more
1 2 3 4 5 6 7 8 9 10